VAL Avionics NAV 2000 Installationsanleitung Seite 68

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 401
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 67
SV-D700 / SV-D1000 / SV-D1000T Installation and Configuration
4-8 SkyView System Installation Guide - Revision R
SV-BAT-320 can keep most SkyView systems operating for at least 60 minutes. The SV-BAT-320
does not supply (backup) power to the following SkyView system devices:
Autopilot servos
Heated AOA/Pitot Probe
SV-ADSB-470
SV-COM-425 / SV-COM-X83
SV-XPNDR-261/262
Any non-Dynon device
SkyView Network Connectors
The two D9 connectors on the back of a SkyView display are SkyView network connectors. They
have identical pin-outs and are electrically connected inside the display (i.e., they are
completely interchangeable). Installers may use either connector or both connectors in SkyView
installations. Reference Table 73 on page 22-9 for SkyView Network Connector pin-out
information.
Network Setup and Status
Once all SkyView modules are connected in a network, either in a bench top test or permanent
installation, turn the display(s) on. You will see the display boot up and the status LEDs on the
modules light up.
A tail number on the Aircraft Information Page (SETUP MENU > SYSTEM SETUP >
AIRCRAFT INFORMATION) is required for network configuration.
If you have more than one display in your SkyView system, the tail number only
needs to be set on the display that you initially perform the Network Configuration
on. At network configuration time, all other displays that are set to the default tail
number of DYNON will automatically have their settings and tail number
synchronized with the display the configuration is performed from. After
configuration, all displays’ tail numbers and settings will be synchronized, and
Seitenansicht 67
1 2 ... 63 64 65 66 67 68 69 70 71 72 73 ... 400 401

Kommentare zu diesen Handbüchern

Keine Kommentare