VAL Avionics NAV 2000 Installationsanleitung Seite 190

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 401
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 189
SV-BAT-320 Installation
9-2 SkyView System Installation Guide - Revision R
Physical Installation
The diagram below shows the mounting dimensions of the backup battery.
Figure 58SV-BAT-320 Mounting Dimensions
Dynon does not provide mounting hardware for use with the SV-BAT-320. The mounting tabs
on each side of the module have holes sized for #8 fasteners. Button head style AN hardware is
recommended as spacing between the holes in the tabs and the body of the enclosure limits
what style tool can be used to tighten certain fasteners. Follow recommended torque practices
when tightening the mounting hardware.
Use of ferrous fasteners in this location is acceptable. Do not rivet the SV-BAT-320 to the
aircraft as this will hinder future removal if necessary.
Seitenansicht 189
1 2 ... 185 186 187 188 189 190 191 192 193 194 195 ... 400 401

Kommentare zu diesen Handbüchern

Keine Kommentare