VAL Avionics NAV 2000 Installationsanleitung Seite 348

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 401
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 347
Appendix A: Maintenance and Troubleshooting
20-8 SkyView System Installation Guide - Revision R
Test Procedure
1. Fully charge the SV-BAT-320 Backup Battery. Reference the Battery Charging section of
the SV-BAT-320 Installation chapter of this manual.
2. Power up one SkyView display on Avionics / Master power. If all SkyView displays power
up from a single switch or circuit breaker, manually power down all but the SkyView
display under test by pushing and holding Button 1 (HOLD TO POWER DOWN).
3. Disconnect primary power from the SkyView display; ensure that the display is not
powered from another source.
4. Press TEST BAT button (Button 8)
5. The BATTERY TEST screen will appear displaying the status of the test. Note that while
the test will last 60 minutes, if the SV-BAT-320 is able to power the system for at least
45 minutes, the battery is normal.
6. The BATTERY TEST can be aborted by pressing the PWR OFF button.
Repeat the test procedure for each backup battery in the system.
If a tested battery does not pass the initial backup battery test, please contact Dynon Avionics
Sales by phone or the online store (http://store.dynonavionics.com) to obtain a replacement
battery.
Troubleshooting
The Display Hardware Information Page (SETUP MENU > LOCAL DISPLAY SETUP > DISPLAY
HARDWARE INFORMATION) can be a valuable resource when troubleshooting SkyView and is
described in the previous section.
Network Configuration Does Not Work or SkyView Network Module Is Not Working
Properly
If you try to configure a SkyView network and it does not work, try the following:
Seitenansicht 347
1 2 ... 343 344 345 346 347 348 349 350 351 352 353 ... 400 401

Kommentare zu diesen Handbüchern

Keine Kommentare